rss
 
comment(s)

archives
J|F|M|A|M|J|J|A|S|O|N|D
(20##) 10 9 8 7 6 5 4 3 2 1 0 <
 
DesktopWeb FormText   electric company visitFri, 21 Dec 2007 23:35:32 GMT # 

they said it'd be 10 days, but they just came out. he found a 'neutral shift' between a junction and the house. so he ran a temporary cable between the 2 and used a machine to simulate a bunch of load. TV was on when he added the load, and everything stayed on. the lights only dimmed a little. so somebody will come out next week and rerun the cable underground. the bad thing is that there is still a bit of a neutral shift. its supposed to match up perfect, but its still a little off even with the temp cable, and he wasn't sure why. he stood there for a while thinking that over. great ...